Ukraine, Odessa region,   +38 0482 300 711 ipark@tis.ua
Рус | Eng

Infrastructure

LAND PLOTS (GREENFIELD)


500 hectares of land are available with various types of engineering, transport and social infrastructure depending on residents’ requirements.

AVAILABLE FOR CONSTRUCTION:

92,77 hectares for the first construction phase;
445,08 hectares for the second construction phase.

Enterprises of transport, energetic, agricultural, chemical and light industries can be allocated on iPARK territory.


LEASE AND PURCHASE OF LAND
    (indicative basis)


LEASING RENT FROM 0,90 USD
for 1 m²
per month

Resident will be provided with a requested land plot connected to various types of infrastructure.  



PURCHASE PRICE FROM 42 USD FOR 1 m²

After start of operations, resident may purchase the land plot under his buildings and structures.



LAND PLOTS (BROWNFIELD)

Also located on the iPARK territory and available for adaptation to your enterprise needs: buildings of the grain handling complex, poultry factory buildings and storage facilities in the phase of construction in process.


ROADS

BUILT DURING THE LAST 19 YEARS:


36 thousand m² of the roadbed
37 km of railway lines

ELECTRICITY


Electricity tariff for iPARK residents is 125 USD/mW-per hour.

At present the iPARK and its’ residents are provided with electricity by the Adzhalyk electrical substation with the power 2х125 mW.

Own reducing transformer with the power 2х16 mW is under construction for further development of the iPARK.


WATER

Water supply: 20 000 m³ per day

Current consumption: 250-300 m³ per day

Water is supplied to the iPARK from the Dniester River, provided by Infoksvodocanal.

Price: 1,08 USD за 1 m³

iPARK territory also disposes of an independent industrial water supply.


GAS

Available natural gas pipeline capacity is 3 000 m³/per hour
provided by distribution net Odessagaz.

Price: 0,51 USD for 1 m³



iPARK CUSTOMS INFRASTRUCTURE



Customs clearance – no more than 4 hours.



DELIVERY POINT «VIZIRKA»


Delivery point «Vizirkа» is a specialized cargo-handling complex performing customs clearance of goods delivered by motor vehicles. The delivery point infrastructure allows rendering high quality services on customs clearance and inspection of any commodities. The complex includes a common office with an operations floor and data processing terminal, inspection ramps for 12 motor vehicles, axial and platform scales, RAPISCAN X-ray scanning device, loaders and special equipment of any kinds.


CHECK POINTS

Check points for motor transport and railway trains are equipped with the magnetic admittance system. Industrial platform scales allow to perform all necessary control procedures. The territory is being monitored by video surveillance system.


CONTAINER TERMINAL


The most modern container terminal on the Black Sea built in 2009. Current capacity— 400 thousand TEU per year, full development capacity— up to 2 mln. TEU per year. Berth length — 480 m, depth — 15 m. Container yard includes 10 blocks for storage of 40-foot containers. One of the blocks is equipped with 308 slots for refrigerated containers. Stuffing services for bulk cargo, packaging of goods and general cargo handling.
Container yard pressure capacity: 30 tons for 1 m².
Maximum loading capacity: 3.600 m²

10,640 of 40-foot containers (TEU) can be stored on the container yard.

We use state-of-the-art container handling equipment:

— 3 STS (“ship-to-shore”) cranes of Super-Post-Panamax class with the loading capacity - 60 t, handling radius — 20 lines, gantry — 30 m.

— 10 RTG cranes with the height of decking up to 5+1 container, the width of decking— 7+1 container.


RAILWAY TERMINAL


“Himicheskaya” private railway station. The current guaranteed throughput capability: 22 RW pairs (1,210 wagons) per day. It includes a depot for locomotives, station building, facility for examination of wagons, electrical signal system, checkpoint, weighing station with RW scales, motor way access point, railway tracks (roadbed and track bed structure with railroad switches), electricity supply, sewage facilities, specialized equipment. Rolling stock of “Himicheskaya” railway station includes 23 locomotives. The project of railway development is being implemented.

Yuzhny railway yard is under construction and will allow to increase capacities of “Himicheskaya” station additionally up to 40 RW pairs (2,200 wagons) per day. The planned cargo throughput will though increase by additional 12 mln. tons per year.

Prospective development of Railway park “B” ” is being designed and will be used for wagons unloading and cargo handling in “Himicheskaya” station. The planned cargo throughput will though increase by additional 15 mln. tons per year.



FIRE SAFETY STATION

The fire station with 2 fire trucks is located within the territory of the enterprise.